21 May 2010

Water Meter Survey due this morning

He has been. It will be a simple job to install a water meter and should be done in the next 2-3 weeks. All the work is outside so I don't need to be around. The meter will include a 1/4 turn stop tap so I can turn off the water to the house using that. (Job reference WMIS 2234206 Engineer G. Wardle

No comments:

Post a Comment